Please use this identifier to cite or link to this item: https://hdl.handle.net/10316.2/33329
Title: Replacement time of mining drilling rigs
Authors: Hamodi, Hussan
Lundberg, Jan
Keywords: capital equipment;decision support models;life cycle cost;optimal replacement time;optimisation model
Issue Date: 2014
Publisher: Imprensa da Universidade de Coimbra
Faculdade de Ciências e Tecnologia da Universidade de Coimbra, Departamento de Engenharia Mecânica
Journal: Colecao:http://hdl.handle.net/10316.2/33309
Abstract: This paper presents a practical model to calculate the optimal replacement time (ORT) of drilling rigs used in underground mining. As a case study, cost data for drilling rig were collected over four years from a Swedish mine. The cost data include acquisition, operating, maintenance and downtime costs when using a redundant rig. A discount rate is used to determine the value of these costs over time. The study develops an optimisation model to identify the ORT of a mining drilling rig which represents a key performance indicator. It uses an artificial neural network (ANN) technique to identify the effect of the various cost factors on the ORT. The absolute ORT in the case study is 87 months, and there is an optimal replacement range within which the company can replace the rig. The results also show that the redundant rig cost has the largest impact on the ORT followed by acquisition, maintenance and operating costs. Regression analysis shows a linear relationship between the cost factors and the ORT of the drilling rig.
URI: https://hdl.handle.net/10316.2/33329
ISBN: 978-972-8954-42-0 (PDF)
DOI: 10.14195/978-972-8954-42-0_17
Rights: open access
Appears in Collections:Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014

Files in This Item:
File Description SizeFormat 
mpmm_artigo17.pdf2.03 MBAdobe PDFThumbnail
  
See online
Show full item record

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.